Overview of all pages
- Home
- HadekTM lining
-
Projects
- Industrial Stack Spurlock power station
- Opatovice power station
- Sadara steam station
- Rybnik power station
- Amercentrale power station unit 9 (2013 project)
- Hongsa power station
- Medupi and Kusile power stations
- Dolna Odra power station
- Pecem and Itaqui power stations
- Patnow power station
- Tanjung Bin power station
- Colbun & Bocamina power stations
- Rovinari power station
- Quang Ninh power station
- Castle Peak power station
- San Juan power station
- Aberthaw power station
- Cottam power station
- Coleson Cove power station
- Craiova power station
- West Burton power station
- Hadong power station
- Pha Lai power station
- Teruel power station
- Sual power station
- Amercentrale power station unit 9
- Dunamenti power station
- New chimney design
-
Publications
- Eliminating reheat and changing over to safe wet stack operation at Opatovice lignite firing plant
- Operating Performance of FGD Wet Stacks in the USA
- Six free standing steel chimneys at Sadara steam station in Saudi Arabia prepared for long term corrosion protection
- Power Station Amercentrale 9 modifies its brick lining for “Wet Stack” operation
- New coal fired Power Stations Pecém I, II and Itaqui use New Chimney Design (NCD)
- Coal fired Rybnik Power Station applied PennguardTM linings to corroded steel chimney flues while leaving old coating system in place
- Lignite fired power station in Romania fits FGD with Wet Booster Fans and PennguardTM lined Concrete Chimneys for maximum Efficiency
- Coal fired Castle Peak Power Station in Hong Kong modifies 250 m reinforced concrete chimney with four steel flues
- Performance of New Chimney Design Structures in the 2010 Chilean Earthquake
- 2010 Chilean Earthquake, Actual vs Designed Response of two New Chimney Design Chimneys
- TXU’s Oak Grove Generating Station protects its steel chimney flues with PennguardTM linings
- Wet Position Booster Fans for Reduced Power Consumption and Optimized Environmental Performance of Power Stations with FGD and Wet Stack
- Innovative New Chimney Design for Wet Flue Gas
- Chimney for Wet Stack Operation
- Planning and design of effective wet duct/stack systems for coal fired utility power plants
- PennguardTM linings in free-standing brick flues – three USA projects
- Performance of the PennguardTM lining during large power plant fires
- EDF Energy Cottam modifies 200m high, multi-flue chimney for Wet Stack operation
- Aberthaw power station prepares existing brick chimney flues for FGD operation by installing PennguardTM linings
-
Study Reports
- New Chimney Design 2.0 – Brick, steel, FRP flue vs Pennguard lined concrete shell, detailed chimney designs
- TÜV Rheinland Health and Safety Study during a large scale Pennguard installation
- New Chimney Design resistant to strong earthquakes
- PennguardTM linings, seismic test performance
- Wet Stack Constructions – Condensation Analysis
- PennguardTM Stack Liner Material for Wet Stacks – An Evaluation
- Chimney fires – PennguardTM linings protect chimneys against fire
- Testing the influence of rapid temperature changes on the PennguardTM 55 Block Lining System
- Videos
- Hadek Services
- Contact