Power Plant: Taichung Power Station 1 - 8

Pennguard lining: installed in new steel FGD ducts. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: Taichung Power Station 1 - 8

Power Plant: Petersburg Power Station Units 1 en 2

Pennguard lining: installed in new steel FGD inlet and outlet ducts. Flue gas treatment: wet FGD – no reheat. Flue gas: unscrubbed 140°C, desulfurized, non-reheated 50°C.

Power Plant: Petersburg Power Station Units 1 en 2

Power Plant: Petersburg Power Station Unit 1

Pennguard lining: installed in existing concrete chimney with steel chimney liner. Flue gas treatment: wet FGD – no reheat. Flue gas: unscrubbed 140°C.

Power Plant: Petersburg Power Station Unit 1

Power Plant: Amercentrale, Unit 8

Pennguard lining: installed in existing steel FGD outlet duct. Flue gas treatment: wet FGD with gas fired reheat. Flue gas: desulfurized, reheated 60°C.

Power Plant: Amercentrale, Unit 8

Power Plant: Elektrarna Tusimice II

Pennguard lining: installed in existing steel duct between GGH and scrubber. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: unscrubbed 130°C – 140°C.

Power Plant: Elektrarna Tusimice II

Power Plant: Hadong Power Station 1 and 2

Pennguard lining: installed in two existing concrete chimneys with brick chimney liner. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Hadong Power Station 1 and 2

Power Plant: Centrale de Cordemais, 4 and 5

Pennguard lining: installed in new steel duct. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: unscrubbed 130°C – 150°C.

Power Plant: Centrale de Cordemais, 4 and 5

Power Plant: Centrale du Havre, Unit 4

Pennguard lining: installed in new steel duct. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: unscrubbed 130°C – 150°C.

Power Plant: Centrale du Havre, Unit 4

Power Plant: Dunamenti Power Station

Pennguard lining: installed in 3 existing concrete chimneys each with three steel chimney liners. Flue gas treatment: no flue gas treatment. Flue gas: unscrubbed 160°C.

Power Plant: Dunamenti Power Station

Power Plant: Amer 9

Pennguard lining: installed in existing concrete chimney with brick chimney liner. Flue gas treatment: wet FGD with steam reheat. Flue gas: desulfurized, reheated 50°C.

Power Plant: Amer 9

Power Plant: Hadong Power Station 3 and 4

Pennguard lining: installed in two new concrete chimneys with Pennguard on concrete. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Hadong Power Station 3 and 4

Power Plant: Boryung Power Station 3 to 6

Pennguard lining: installed in 4 existing concrete chimneys with brick liner. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Boryung Power Station 3 to 6

Power Plant: Sual Power Station

Pennguard lining: installed in new concrete chimney with two steel chimney liners. Flue gas treatment: wet FGD with 30% bypass. Flue gas: desulfurized, reheated 74 – 80 °C.

Power Plant: Sual Power Station

Power Plant: Teruel Power Station Unit 1,2 and 3

Pennguard lining: installed in 3 new steel outlet ducts. Flue gas treatment: wet FGD with hot air reheat. Flue gas: scrubbed 60 °C, desulfurized, reheated 85 °C.

Power Plant: Teruel Power Station Unit 1,2 and 3

Power Plant: Taean Power Station 1 to 4

Pennguard lining: 4 existing concrete chimneys with internal brick liner. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Taean Power Station 1 to 4

Power Plant: Teruel Power Station Unit 1,2 and 3

Pennguard lining: installed in lower 51 m of existing single brick chimney liner. Flue gas treatment: wet FGD with hot air reheat. Flue gas: desulfurized, reheated 75 - 85°C.

Power Plant: Teruel Power Station Unit 1,2 and 3

Power Plant: Pha-Lai 2 Power Station

Pennguard lining: installed in new concrete chimney with 2 steel chimney liners. Flue gas treatment: wet FGD with 15% bypass. Flue gas: desulfurized, reheated 60°C.

Power Plant: Pha-Lai 2 Power Station

Power Plant: Hadong Power Station 5 and 6

Pennguard lining: installed in 2 new chimneys, directly onto concrete shell. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Hadong Power Station 5 and 6

Power Plant: Ho-Ping Power Station

Pennguard lining: installed in new concrete chimney with 2 steel flues. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized reheated 90°C.

Power Plant: Ho-Ping Power Station

Power Plant: West Burton Power Station

Pennguard lining: installed in 2 new concrete chimneys with each 2 steel flues. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 88°C.

Power Plant: West Burton Power Station

Power Plant: Craiova Power Station

Pennguard lining: installed in existing chimney on concrete shell. Flue gas treatment: no FGD at present time. Flue gas: unscrubbed 140 - 160°C.

Power Plant: Craiova Power Station

Power Plant: Samchonpo Power Station 1 – 4

Pennguard lining: installed in 2 existing steel chimneys with 4 steel flues each. Flue gas treatment: wet FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 85°C.

Power Plant: Samchonpo Power Station 1 – 4

Power Plant: Coleson Cove Generating Station

Pennguard lining: installed in new concrete chimney with 2 steel chimney liners. Flue gas treatment: wet FGD and wet precipitator. Flue gas: desulfurized, non-reheated 57°C (wet stack).

Power Plant: Coleson Cove Generating Station

Power Plant: Coleson Cove Generating Station

Pennguard lining: installed in new concrete chimney with 2 steel chimney liners. Flue gas treatment: wet FGD and wet precipitator. Flue gas: desulfurized, non-reheated 57°C (wet stack).

Power Plant: Coleson Cove Generating Station

Power Plant: Vasilikos Phase II, Unit 3

Pennguard lining: installed in new concrete chimney with 3 steel flues. Flue gas treatment: sea water FGD / GGH reheat. Flue gas: desulfurized, reheated 84°C.

Power Plant: Vasilikos Phase II, Unit 3

Power Plant: Cottam Power Station

Pennguard lining: installed in 4 existing concrete chimneys each with 4 concrete flues. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C (wet stack).

Power Plant: Cottam Power Station

Power Plant: Cottam Power Station

Pennguard lining: installed in 4 existing concrete chimneys each with 4 concrete flues. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C (wet stack).

Power Plant: Cottam Power Station

Power Plant: Craig Generating Station 1 and 2

Pennguard lining: installed in 2 existing concrete chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 48°C (wet stack).

Power Plant: Craig Generating Station 1 and 2

Power Plant: Craig Generating Station 1 and 2

Pennguard lining: installed in 2 existing concrete chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 48°C (wet stack).

Power Plant: Craig Generating Station 1 and 2

Power Plant: Tanners Creek Unit 4

Pennguard lining: installed in existing freestanding steel chimney. Flue gas: unscrubbed 155°C.

Power Plant: Tanners Creek Unit 4

Power Plant: Aberthaw Power Station

Pennguard lining: installed in existing chimney with 3 brick liners. Flue gas treatment: sea water FGD. Flue gas: desulfurized, reheated 50°C, FGD bypass 130°C.

Power Plant: Aberthaw Power Station

Power Plant: Tanjung Bin Power Station

Pennguard lining: installed in new concrete chimney with 3 steel flues. Flue gas treatment: sea water FGD / bypass reheat. Flue gas: desulfurized, reheated 75°C, FGD bypass 137°C.

Power Plant: Tanjung Bin Power Station

Power Plant: Uong Bi Power Station

Pennguard lining: installed in new concrete chimney with 1 steel flue. Flue gas treatment: wet FGD with partial bypass. Flue gas: desulfurized, reheated 60°C.

Power Plant: Uong Bi Power Station

Power Plant: KW Weisweiler Block G/H

Pennguard lining: installed in existing chimney with 1 brick flue. Flue gas treatment: combined cycle. Flue gas: unscrubbed 98°C, up to 160°C.

Power Plant: KW Weisweiler Block G/H

Power Plant: Dallmann Power Station

Pennguard lining: installed in existing chimney with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C (wet stack).

Power Plant: Dallmann Power Station

Power Plant: Dallmann Power Station

Pennguard lining: installed in existing chimney with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C (wet stack).

Power Plant: Dallmann Power Station

Power Plant: Killen Station Unit 2

Pennguard lining: installed in existing chimney with brick liner and installed in existing steel bypass duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C, FGD bypass 139°C (wet stack).

Power Plant: Killen Station Unit 2

Power Plant: Killen Station Unit 2

Pennguard lining: installed in existing chimney with brick liner and installed in existing steel bypass duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C, FGD bypass 139°C (wet stack).

Power Plant: Killen Station Unit 2

Power Plant: Killen Station Unit 2

Pennguard lining: installed in existing chimney with brick liner and installed in existing steel bypass duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C, FGD bypass 139°C (wet stack).

Power Plant: Killen Station Unit 2

Power Plant: Marshall Steam Station Unit 1,2,3 and 4

Pennguard lining: installed in new steel ductwork. Flue gas treatment: wet limestone FGD. Flue gas: mix of 5% air and unscrubbed flue gas of 138°C (open-bypass system).

Power Plant: Marshall Steam Station Unit 1,2,3 and 4

Power Plant: Mitchell Power Station

Pennguard lining: installed in new steel FGD outlet and chimney breeching ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C.

Power Plant: Mitchell Power Station

Power Plant: Maritsa East 2 Power Station

Pennguard lining: installed in existing chimney with concrete / brick liner and installed in existing steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 73°C, emergency bypass 160°C (wet stack).

Power Plant: Maritsa East 2 Power Station

Power Plant: Maritsa East 2 Power Station

Pennguard lining: installed in existing chimney with concrete / brick liner and installed in existing steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 73°C, emergency bypass 160°C (wet stack).

Power Plant: Maritsa East 2 Power Station

Power Plant: Maritsa East 2 Power Station

Pennguard lining: installed in existing chimney with concrete / brick liner and installed in existing steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 73°C, emergency bypass 160°C (wet stack).

Power Plant: Maritsa East 2 Power Station

Power Plant: Tanjung Bin Power Station

Pennguard lining: installed in 3 new FRP outlet ducts. Flue gas treatment: sea water FGD / bypass reheat. Flue gas: desulfurized, reheated, mix of scrubbed 36°C and unscrubbed 160°C.

Power Plant: Tanjung Bin Power Station

Power Plant: Rabigh Power and Desalination Plant

Pennguard lining: installed in 3 new steel chimneys and new steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 58°C, emergency bypass 163°C (wet stack).

Power Plant: Rabigh Power and Desalination Plant

Power Plant: Rabigh Power and Desalination Plant

Pennguard lining: installed in 3 new steel chimneys and new steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 58°C, emergency bypass 163°C (wet stack).

Power Plant: Rabigh Power and Desalination Plant

Power Plant: Rabigh Power and Desalination Plant

Pennguard lining: installed in 3 new steel chimneys and new steel inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 58°C, emergency bypass 163°C (wet stack).

Power Plant: Rabigh Power and Desalination Plant

Power Plant: Patnow Power Station Unit 1-4

Pennguard lining: installed in 2 new concrete chimneys, on concrete shell directly (New Chimney Design). Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 67°C (wet stack).

Power Plant: Patnow Power Station Unit 1-4

Power Plant: Patnow Power Station Unit 1-4

Pennguard lining: installed in 2 new concrete chimneys, on concrete shell directly (New Chimney Design). Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 67°C (wet stack).

Power Plant: Patnow Power Station Unit 1-4

Power Plant: Jimah Power Station

Pennguard lining: installed in new concrete chimney with 2 steel chinney liners. Flue gas treatment: sea water FGD / bypass reheat. Flue gas: desulfurized, reheated 75°C, FGD bypass 140°C.

Power Plant: Jimah Power Station

Power Plant: Zimmer Generating Station

Pennguard lining: installed in existing concrete chimney with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, reheated 57°C.

Power Plant: Zimmer Generating Station

Power Plant: Kilroot Power Station

Pennguard lining: installed in existing concrete chimney with 2 steel flues and installed in 2 existing steel outlet ducts. Flue gas treatment: sea water FGD / GGH reheat. Flue gas: desulfurized, reheated 57°C, emergency bypass 155°C.

Power Plant: Kilroot Power Station

Power Plant: Kilroot Power Station

Pennguard lining: installed in existing concrete chimney with 2 steel flues and installed in 2 existing steel outlet ducts. Flue gas treatment: sea water FGD / GGH reheat. Flue gas: desulfurized, reheated 57°C, emergency bypass 155°C.

Power Plant: Kilroot Power Station

Power Plant: Fiddler’s Ferry Power Station Units 2,3 and 4

Pennguard lining: installed in 3 existing brick lined concrete flues within a 4-flue chimney. Flue gas treatment: wet limestone FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 82°C, FGD bypass 130°C.

Power Plant: Fiddler’s Ferry Power Station Units 2,3 and 4

Power Plant: Ferrybridge Power Station Units 3 and 4

Pennguard lining: installed in existing concrete chimney with brick liner. Flue gas treatment: wet limestone FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 82°C, FGD bypass 130°C.

Power Plant: Ferrybridge Power Station Units 3 and 4

Power Plant: Rugeley Power Station

Pennguard lining: installed in new concrete chimney with 2 steel flues. Flue gas treatment: wet limestone FGD with gas-gas-reheat. Flue gas: desulfurized, reheated 80-90°C, FGD bypass 130°C.

Power Plant: Rugeley Power Station

Power Plant: Plant Hammond Unit 1,2,3 and 4

Pennguard lining: installed in new steel ductwork between electrostatic precipitators and FGD absorber. Flue gas treatment: wet limestone FGD. Flue gas: mix of 5% air and unscrubbed flue gas of 140°C (open-bypass system).

Power Plant: Plant Hammond Unit 1,2,3 and 4

Power Plant: Centrale de Provence Unit 5

Pennguard lining: installed in new steel ductwork between scrubber and chimney. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: Centrale de Provence Unit 5

Power Plant: Mondi Packaging Paper Mill

Pennguard lining: installation spring 2008, in new concrete chimney, directly onto concrete shell (New Chimney Design). Flue gas: unscrubbed 140°C.

Power Plant: Mondi Packaging Paper Mill

Power Plant: San Juan Generating Station Unit 3 and 4

Pennguard lining: installed in 2 existing chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: San Juan Generating Station Unit 3 and 4

Power Plant: San Juan Generating Station Unit 3 and 4

Pennguard lining: installed in 2 existing chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: San Juan Generating Station Unit 3 and 4

Power Plant: Haiphong I Thermal Power Plant

Pennguard lining: installation spring 2008, in new concrete chimney with 2 steel flues. Flue gas treatment: wet limestone FGD with partial bypass. Flue gas: desulfurized, reheated 60°C.

Power Plant: Haiphong I Thermal Power Plant

Power Plant: Mayo Generating Station Unit 1

Pennguard lining: installation spring 2008, in new concrete chimney with steel chimney liner and installed in new steel outlet duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: Mayo Generating Station Unit 1

Power Plant: Mayo Generating Station Unit 1

Pennguard lining: installation spring 2008, in new concrete chimney with steel chimney liner and installed in new steel outlet duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: Mayo Generating Station Unit 1

Power Plant: Mayo Generating Station Unit 1

Pennguard lining: installation spring 2008, in new concrete chimney with steel chimney liner and installed in new steel outlet duct. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: Mayo Generating Station Unit 1

Power Plant: San Juan Generating Station Unit 1 and 2

Pennguard lining: installation autumn 2008/ spring 2009 in 2 existing concrete chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: San Juan Generating Station Unit 1 and 2

Power Plant: San Juan Generating Station Unit 1 and 2

Pennguard lining: installation autumn 2008/ spring 2009 in 2 existing concrete chimneys with brick liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: San Juan Generating Station Unit 1 and 2

Power Plant: Castle Peak B Power Station Unit 1 – 4

Pennguard lining: installation 2008 through 2010 in existing concrete chimney with 4 steel flues. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, reheated 80°C, FGD bypass 150°C.

Power Plant: Castle Peak B Power Station Unit 1 – 4

Power Plant: Amos Power Station Unit 1,2 and 3

Pennguard lining: installed in new steel FGD outlet and chimney inlet ducts. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C.

Power Plant: Amos Power Station Unit 1,2 and 3

Power Plant: Spurlock Power Station Unit 1 and 2

Pennguard lining: installation spring 2008, in 2 new concrete chimneys with a steel flue. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: Spurlock Power Station Unit 1 and 2

Power Plant: Spurlock Power Station Unit 1 and 2

Pennguard lining: installation spring 2008, in 2 new concrete chimneys with a steel flue. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 52°C (wet stack).

Power Plant: Spurlock Power Station Unit 1 and 2

Power Plant: Oak Grove Generating Station Unit 1 and 2

Pennguard lining: installation 2008/2009, in 2 new concrete chimneys with a steel chimney liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 60°C (wet stack).

Power Plant: Oak Grove Generating Station Unit 1 and 2

Power Plant: Oak Grove Generating Station Unit 1 and 2

Pennguard lining: installation 2008/2009, in 2 new concrete chimneys with a steel chimney liner. Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 60°C (wet stack).

Power Plant: Oak Grove Generating Station Unit 1 and 2

Power Plant: Jimah Power Station

Pennguard lining: installed in 2 new FRP outlet ducts. Flue gas treatment: sea water FGD / bypass reheat. Flue gas: desulfurized, reheated.

Power Plant: Jimah Power Station

Power Plant: Guacolda Power Station, Unit 3

Pennguard lining: installation in 2008, in a concrete chimney, on concrete shell directly (New Chimney Design). Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 55°C.

Power Plant: Guacolda Power Station, Unit 3

Power Plant: Guacolda Power Station, Unit 3

Pennguard lining: installation in 2008, in a concrete chimney, on concrete shell directly (New Chimney Design). Flue gas treatment: wet limestone FGD. Flue gas: desulfurized, non-reheated 55°C.

Power Plant: Guacolda Power Station, Unit 3

Power Plant: Ventanas III Power Station

Pennguard lining: installation in 2008, in a concrete chimney, on concrete shell directly (New Chimney Design). Flue gas treatment: semi dry absorber. Flue gas: desulfurized, non-reheated 90°C

Power Plant: Ventanas III Power Station

Power Plant: Ventanas III Power Station

Pennguard lining: installation in 2008, in a concrete chimney, on concrete shell directly (New Chimney Design). Flue gas treatment: semi dry absorber. Flue gas: desulfurized, non-reheated 90°C

Power Plant: Ventanas III Power Station

Power Plant: Cholla Generating Station, Unit 4

Pennguard lining: installed in existing concrete chimney with brick liner. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: Cholla Generating Station, Unit 4

Power Plant: Stanton Energy Center, Unit 1 and 2

Pennguard lining: installed in new steel outlet ductwork. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: Stanton Energy Center, Unit 1 and 2

Power Plant: East Bend Generating Station

Pennguard lining: installed in new steel outlet ductwork. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: East Bend Generating Station

Power Plant: Oglethorpe Paper Mill

Pennguard lining: installed in existing chimney, on concrete shell directly. Flue gas treatment: wet FGD / by-pass reheat. Flue gas: desulfurized, reheated 90°C / unscrubbed.

Power Plant: Oglethorpe Paper Mill

Power Plant: Oglethorpe Paper Mill

Pennguard lining: installed in existing chimney, on concrete shell directly. Flue gas treatment: wet FGD / by-pass reheat. Flue gas: desulfurized, reheated 90°C / unscrubbed.

Power Plant: Oglethorpe Paper Mill

Power Plant: St. John's Power Park, Unit 1 and 2

Pennguard lining: installed in new steel outlet ductwork. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: St. John's Power Park, Unit 1 and 2

Power Plant: Fayette Generating Station, Unit 3

Pennguard lining: installed in new steel outlet ductwork. Flue gas treatment: wet FGD. Flue gas: desulfurized, non-reheated 50°C.

Power Plant: Fayette Generating Station, Unit 3